title | waiting for the outage 3 |
---|---|
description | Georgia Tech and Turner Construction workers wait for the 5:15pm cutoff of power to begin work on a damaged 4kV power line |
aperture | 2.9 |
date captured | 2001:11:28 17:08:39 |
exposure bias | 0.00 |
exposure index | 100 |
flash fired | Not Fired |
fnum | 3.0 |
focal length_mm | 6.30 |
height | 1168 |
maker note | 0106030101000000ffffffff07d10b1c110827550002000000 |
max aperture | 2.9 |
metering | Average |
exposure | 1/90 |
shutter speed | 1/64 |
width | 1760 |
filename | dcp_4812.jpg |